Composite Walls/13/en
From Unofficial Stationeers Wiki
With the Construction Kit (Walls) in hand, right click to activate build mode. Use the Scroll Wheel on your mouse to select Composite Wall. Use the rotation keys to place the wall in the appropriate location. Composite Walls have 2 build steps. To complete the wall, right-click on it with a Steel Sheet to add the white facade. Composite Walls will only finish one "side" of that wall. To get proper finishing on both sides, you would need two of each of the two materials (one set for each side).